Quote from: garyklein on October 29, 2009, 01:21:30 PM
I am planning a small tunnel on an indoor track, so it will be easy to lift it off for service. I would like to keep it as low as possible in order to run another track over the top. What do you think the steepest grade would be that will work with four cars on? I don't have a lot of length to make my elevation. I don't think I can keep it under 4%
Gary
Im working on a similar project (xmas display) with similar space constraints.
I found it useful to do a couple actual setups to ensure my design would even be possible.
Being an uber-novice my first trial had upwards of a 13% grade!
But I massaged the gradient down to about 7 or 8 and its runs pretty smoothly even pulling 5 cars.
Consider that even though the 4% suggestion is not the mechanical limit....more work will be required by your loco to cover the increased load. Still being a beginner myself i'm not sure this is a long term solution with regards to its effect on the loco's motor.