Hi,
I just thought I would add a little to the Connie debate about the gearing.
A couple of years ago a prized Spectrum 2-6-0 cracked the main drive gear, after much aggro and some very helpful assistance from other users of this page ( thanks Peter)
I obtained and with great care fitted a new Gear, and all was well with the world.
UNTIL I got my Connie out ready for a run prior to open day 3 days ago and what happens???
you guessed it a whirring from the gearbox and no movement.
I did the obvious and checked but not looking for a another split did not find one but upon sitting on the track same happened again.
I am Totally disgusted! words fail to describe the anger and frustration I feel that I have to go through the same rigmorole all over again because of penny pinching OR worse poor design and quality control.
I am the original owner and the loco has clocked up all of 6hrs runtime from new, BUT I live in the UK and do not have the luxury of sending it back to Bachmann. and If I did I certainly would not want another cheap solution fitted.
I will be sending off for another gear and like as not will end up doing it myself, the sad thing is I have a Spectrum 4-4-0 which no doubt will do the same thing to me.
I would demand that this is put right for I really feel that this should never have happened, but the waiting time and cost of posting is really not worth it, I blooming well hope that this has been dealt with otherwise I for one will not be buying anymore Bachmann loco's if this is what I have to do in order to run them.
Oh I failed to mention the tender truck problems of which one was broken from new. But thats another story.
Kind but angry regards
Casey.
I just thought I would add a little to the Connie debate about the gearing.
A couple of years ago a prized Spectrum 2-6-0 cracked the main drive gear, after much aggro and some very helpful assistance from other users of this page ( thanks Peter)
I obtained and with great care fitted a new Gear, and all was well with the world.
UNTIL I got my Connie out ready for a run prior to open day 3 days ago and what happens???
you guessed it a whirring from the gearbox and no movement.
I did the obvious and checked but not looking for a another split did not find one but upon sitting on the track same happened again.
I am Totally disgusted! words fail to describe the anger and frustration I feel that I have to go through the same rigmorole all over again because of penny pinching OR worse poor design and quality control.
I am the original owner and the loco has clocked up all of 6hrs runtime from new, BUT I live in the UK and do not have the luxury of sending it back to Bachmann. and If I did I certainly would not want another cheap solution fitted.
I will be sending off for another gear and like as not will end up doing it myself, the sad thing is I have a Spectrum 4-4-0 which no doubt will do the same thing to me.
I would demand that this is put right for I really feel that this should never have happened, but the waiting time and cost of posting is really not worth it, I blooming well hope that this has been dealt with otherwise I for one will not be buying anymore Bachmann loco's if this is what I have to do in order to run them.
Oh I failed to mention the tender truck problems of which one was broken from new. But thats another story.
Kind but angry regards
Casey.