News:

Please read the Forum Code of Conduct   >>Click Here <<

Main Menu
Menu

Show posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.

Show posts Menu

Messages - PJM

#1
Joe,

Thanks for your quick and considerate response.  This is helpful.  It also confirms that what I'm trying to do is in fact not straight forward and will take a bit of finessing.  With your insight as a place to start - I think I can make it work.  If needed, I can easily enough make a 2" segment by cutting and splicing a longer segment.

For a number of years I've been annually setting up atlas HO using flex track hot glued onto foamcore base to run around the christmas tree (the 26" R loop) with extensions then going around the living room, under furniture, and for a few years also splitting off to run through/around my son's room.  After a number of years of dismantling, reassembling, stepping/tripping on the track and annually modifying the layout - I'm looking this year to start from scratch.  The snap together ez-track appears to be a simpler more robust alternative.   

Thank you
 
#2
Working with Bachmann gray EZ-Track, I'm looking to create a 360 degree 26" radius circlular section of track tangent to a straight section.  The turnouts off the straight section will be made by connecting the singe end of a #5 L turnout to the single end of a #5 R turnout.     

1. Since the turnouts include a short straight eazement section - I expect that the loop will require some other segments in combination with standard 26" radius sections.  What combination & quantity of gray EZ-Track segments are needed to create a 26" R circle connecting to the turnout eazements?

2. Is a dimensioned layout drawing available for the EZ-Track #5 turnout?

3. I understand tha the straight side of the #5 turnout is 11 1/2 " length?

4. Is the curved portion of the #5 turnout equal to (replaceable) by any particular standard curved segment of track?  (30 degree 18"R ?)

thank you
   


onof tracks are needed to