News:

Please read the Forum Code of Conduct   >>Click Here <<

Main Menu
Menu

Show posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.

Show posts Menu

Messages - Loud1952

#2
Thanks to all!  I have a lot to think about!
#3
No.  I'm completely ignorant about it!
#4
I'm planning on a small 4x4 HO layout.  I know that this is the smallest space in which I can put an HO layout and was wondering if I can do 2 train operation if I use a couple of short sidings with short trains.  I'd like to run the trains separately, using the sidings to hold one train while the other one runs.  I know that I'll have to use short stock.  Can anyone tell me if it's possible and if so where I can find detailed instructions to wire it correctly?
Thanks much!