Thanks for the info! That pretty much solves my problem and I will not be messing with this older set.
Quote from: Jerrys HO on December 12, 2011, 02:58:50 PM
bd-
It can be done as you would have to shim the old track up to the height of the easy track. Try doing a search for this as another post had some good ideas on what to use. I believe the best result was using O gauge roadbed as it brouht the track closer to the E Z track height. I use all E Z track so I am only speculating what others have posted.
Jerry