It dawned on me that I could eliminate about nine feet of buss wire by running drops from the upper helix track to the buss wire already there. This would mean that some of the 18 gauge drops would be on the order of two feet long.
Which would be better - buss the upper level and have shorter drops to it or cut off nine feet of buss wire?
Gene
Which would be better - buss the upper level and have shorter drops to it or cut off nine feet of buss wire?
Gene