News:

Please read the Forum Code of Conduct   >>Click Here <<

Main Menu

Eztrack plans to run 3 dc trains on 4x8 layout

Started by tomaz12, November 24, 2024, 03:12:17 PM

Previous topic - Next topic

tomaz12

Looking for ez track HO plans for a layout to run 3 dc trains on a 4x8 platform. I've been collecting pieces for a long time, and it's time to build. Thank whomever in advance.

Len

This may give you some ideas to start with. With two passing sidings, you should be able to operate two trains on the mainline, plus a yard switcher. You could even add an industrial area switcher. All switches are #4's. The short filler pieces on the straight legs of the mainline #4's are a 1" and a 0.75" The curved section to create the one parallel track in the yard is a 1/2 18" radius curve. The mainline curves are 18" radius. The industrial area spur could be shifted to the left or right if needed for your preferences.



To add operating interest, part of the upper passing siding could be used as yard lead, but you'll need to make sure it's clear when a mainline train is due.

Len
If at first you don't succeed, throw it in the spare parts box.

jward

Quote from: Len on November 24, 2024, 04:31:39 PMThis may give you some ideas to start with. With two passing sidings, you should be able to operate two trains on the mainline, plus a yard switcher. You could even add an industrial area switcher. All switches are #4's. The short filler pieces on the straight legs of the mainline #4's are a 1" and a 0.75" The curved section to create the one parallel track in the yard is a 1/2 18" radius curve. The mainline curves are 18" radius. The industrial area spur could be shifted to the left or right if needed for your preferences.






TO use this plan on DC you will need to divide the track into electrically isolated sections called blocks, which can then be connected to any of your three controllers. Google "block control wiring" to see how to do this.

To add operating interest, part of the upper passing siding could be used as yard lead, but you'll need to make sure it's clear when a mainline train is due.

Len
Jeffery S Ward Sr
Pittsburgh, PA