News:

Please read the Forum Code of Conduct   >>Click Here <<

Main Menu

Why I Like HO Track for On30

Started by hminky, May 30, 2008, 04:13:02 PM

Previous topic - Next topic

tac

Quote from: Steve Magee on June 09, 2008, 09:36:18 AM
Although I use Peco On30 track, I'm with Harold - I prefer what looks right. Here is an example of Peco track I have ballasted

On this one, the track ties are visible but nobody has yet said "Gee, your ties are too skinny" :)
PS - no, the tunnel portal is not at an angle - the camera was though :)
Steve Magee Newcastle NSW Aust

Dribble.

tac

japasha

Harold,

I like the HO track method myself but I do it a bit differently. I use the rail and hand-lay on On3 ties. Pretty easy there. I use Atlas switches modified to be laid on On3 swith ties.  I remove the plastic HO ties from the switch and then lay the remaining rails and frog on the ties. My portable module has trackwork done this way and it has proven to be easy to wire and operate. I cheat on my On3 layouts but use #6 or #8 switches for that project.