I though that this would be a Q&A to a real person at the company, not an open board. I don't know how to be answers this way, but here goes.... I just acquired the HO "Rail Boss" train set. I don't want to do anything fancy or complicated. My husband is doing that with his N-gauge set-up, which is getting started.
I need to know the following:
1. As I do not have permanent space for my track layout, how frequently can the "E-Z" track sections be taken apart and put back together? How many times before the parts start to fail?
2. I have the catalog. It looks like the included track is steel alloy/black roadbed. What is the difference between that and the nickel silver/gray roadbed? If you expand, can you mix the two? Why or why not?
3. How many cars can the engine safely pull? I bought an additional Bachmann B&O boxcar to use with this set.
Thank you to anyone who knows more than I do.
Novice Train Owner
I need to know the following:
1. As I do not have permanent space for my track layout, how frequently can the "E-Z" track sections be taken apart and put back together? How many times before the parts start to fail?
2. I have the catalog. It looks like the included track is steel alloy/black roadbed. What is the difference between that and the nickel silver/gray roadbed? If you expand, can you mix the two? Why or why not?
3. How many cars can the engine safely pull? I bought an additional Bachmann B&O boxcar to use with this set.
Thank you to anyone who knows more than I do.
Novice Train Owner